STT GDC India is building its second Kolkata data centre at the Silicon Valley Hub in New Town, Rajarhat, in the NKDA area on the north-eastern edge of the metropolitan area rather than in Kolkata proper. The scheme runs to 243,000 sq ft and 6 MW of IT load - about twelve times the floor area of STT Kolkata 1, the 20,000 sq ft, 3 MW building at VSB Ultadanga that has carried the operator's Kolkata traffic so far. New Town is described as coming soon, with no opening date attached. The developer is the ST Telemedia joint venture that took over Tata Communications' Indian data centre estate on 19 October 2016.
Facility Specifications
Site information
- Colocation space
- 243,000 sq ft as planned
- Power capacity
- 6 MW IT load as planned
Request a Quote
Quote request for: STT Kolkata DC 2 view facility
Location
Frequently asked questions
Which part of Kolkata is the second STT site in?
The Silicon Valley Hub at New Town, Rajarhat, in the NKDA area north-east of the city - not the Ultadanga site that houses STT Kolkata 1.
How big will STT Kolkata 2 be?
243,000 sq ft with 6 MW of IT load, against 20,000 sq ft and 3 MW at STT Kolkata 1.
What stage has the New Town building reached?
Pre-operational. STT GDC India lists it as coming soon and has published no commissioning date.
Which companies stand behind STT GDC India?
ST Telemedia holds 74 per cent and Tata Communications 26 per cent, an arrangement in place since the Indian estate transferred on 19 October 2016.
How would a buyer reserve capacity at New Town?
Through STT GDC India, which will own and operate the building. At 6 MW against 3 MW at Ultadanga, New Town is the operator's growth capacity for the Kolkata market.