Bagneaux-sur-Loing Data Center

Rue du Gâtinais & Rue du Stade, Bagneaux Sur Loing, 77167, FR

Get a quote

Metro: Bagneaux Sur Loing, FR Country: France Region: Europe

The scheme at Bagneaux-sur-Loing would put a data centre on the brownfield left by the town's former Thomson factory, in Seine-et-Marne roughly 85 km south of Paris. Property developer Groupe Essor is taking it forward with the energy company Theia Energy, and no data centre operator has been attached to it. The design keeps the old factory chimneys standing and routes waste heat through exchangers into greenhouses and aquaculture ponds, targeting about 50 tonnes of tomatoes a year. Capacity, floor area, a permit reference and a timetable all remain to be published, and the partners describe funding as undetermined.


Request a Quote

Quote request for: Bagneaux-sur-Loing Data Center view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

What is proposed for the old Thomson site at Bagneaux-sur-Loing?
A data centre on the factory brownfield, with waste heat piped through exchangers to greenhouses and aquaculture ponds producing around 50 tonnes of tomatoes a year.
Which parties are behind the Bagneaux-sur-Loing project?
Groupe Essor, a property developer and constructor, working with the energy company Theia Energy. An operator for the finished building has yet to be named.
How far is Bagneaux-sur-Loing from Paris?
About 85 km south, in Seine-et-Marne, rather than in the Paris metro proper - relevant to latency and to fibre routing from the capital.
What has been published about size and timing?
Neither a capacity figure nor a floor area, permit reference or delivery date. Theia describes the financials and the timeline as still to be determined.