Busan Metropolitan City and Microsoft cut the ribbon on this building at Gurang-dong in Gangseo-gu on 23 September 2024, four years after the first Microsoft datacentre opened in the same Miumsandan industrial complex in April 2020. Commissioning records give it a gross floor area of 35,312 m2. Hyundai E&C built it to a masterplan drawn by dmp partners in 2021, with HanmiGlobal managing the project. The two Busan buildings are reported at 85 MW between them, and a third and much larger facility is planned at 125 MW and a cost above 2 trillion won, with construction from October 2026 - the start, in the city's telling, of a cluster meant to reach 400 MW. Per-building capacity, land area and water consumption remain undisclosed.
Facility Specifications
Site information
Colocation space
35,312 m2 gross floor area
Request a Quote
Quote request for: Microsoft Busan (PUS05) view facility
Location
Interactive map
Frequently asked questions
When did this building open?
Busan Metropolitan City and Microsoft held the completion ceremony on 23 September 2024 in Gurang-dong, Gangseo-gu.
How large is it?
Commissioning records put the gross floor area at 35,312 square metres. Power capacity for the individual building has not been disclosed.
Which contractors delivered it?
Hyundai E&C constructed it, working to a 2021 masterplan by dmp partners, with HanmiGlobal as project manager.
How much capacity does Busan hold overall?
The two completed Microsoft buildings are reported at 85 MW combined, with a third planned at 125 MW from October 2026 and a stated ambition of a 400 MW cluster.