NextStream Ixtlahuaca

Calle Buenos Aires Lote 3 4 Y 5 Mz Ixtlahuaca, Ixtlahuaca de Rayon, 50740, MX

Get a quote

Metro: Toluca, MX Country: Mexico Region: North America

Colocation space
1,800+
Power capacity
2.2 MW

The data centre stands on Calle Buenos Aires, Lotes 3, 4 y 5 in Ixtlahuaca de Rayon, Estado de Mexico - close to Toluca International Airport and under 90 km from Mexico City, in Ixtlahuaca's municipality rather than the neighbouring city's. Its certification record is the strongest of any site in NextStream's Latin American estate. Three awards sit in the Uptime Institute register: Tier III design documents for the facility as a whole, and for Phase 1 both a Tier III constructed-facility certificate and Tier III Gold for operational sustainability. That last one is worth asking about, because it attests how the building is staffed and maintained rather than how it was drawn. Around 1,800 m2 of IT space carries about 2.2 MW of IT load, with a medium-term route to 8 MW. Telefonica built the site, Nabiax inherited it, and Actis bought the eleven-site portfolio outright in 2023 before putting the NextStream name on it.

Facility Specifications

Site information

Colocation space
1,800+ m2 IT space
Power capacity
2.2 MW IT load

Compliance

Uptime Tier III Design Documents Uptime Tier III Constructed Facility Uptime Tier III Operational Sustainability

Request a Quote

Quote request for: NextStream Ixtlahuaca view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

Which Uptime Institute awards cover the Ixtlahuaca facility?
Three. A Tier III Certification of Design Documents for the site, and for Phase 1 both a Tier III Certification of Constructed Facility and a Tier III Gold Certification of Operational Sustainability.
How much IT load does the Ixtlahuaca site carry?
About 2.2 MW across some 1,800 m2 of IT space, with a medium-term ceiling put at 8 MW.
How did Actis come to own this Mexican site?
Through a 2023 purchase of an eleven-site Latin American and US portfolio from Nabiax, a Telefonica and Asterion Industrial Partners venture. The sites took the NextStream name the same year.
What does a Gold operational sustainability award add to a Tier III certificate?
The constructed-facility certificate attests the building as built; the Gold operational sustainability award attests the way it is staffed, maintained and managed in service.
How far is Ixtlahuaca from Mexico City?
Under 90 km, on the Toluca side of the capital, with Toluca International Airport nearby.