IREN Sweetwater 2

1782 Farm-to-Market 540, Hamlin, TX, 79520, US

Get a quote

Metro: Abilene, TX, US Country: United States Region: North America

Power capacity
600 MW

Sweetwater 2 is the second phase of IREN's West Texas campus, on more than 500 acres near Hamlin in Fisher County - Sweetwater is the market name the operator uses, and the town it is named for lies in the next county. A binding grid connection agreement signed on 17 March 2025 covers 600 MW, taking the two-phase campus to 2,000 MW across 2,200 acres alongside Sweetwater 1's 1,400 MW and IREN's West Texas total to 2.75 GW. Power comes straight off ERCOT through a 1,400 MW bulk substation at 345 kV and 138 kV, stepping down through 138/34.5 kV primary substations. Energization is planned for 2027; Sweetwater 1 energized in April 2026 and connected its high-voltage substation the month after. Direct-to-chip liquid cooling is planned for the halls.

Facility Specifications

Site information

Power capacity
600 MW contracted; 2,000 MW across the two-phase campus

Power & cooling

Cooling
Direct-to-chip liquid cooling, as planned

Request a Quote

Quote request for: IREN Sweetwater 2 view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

What stage is Sweetwater 2 at?
Under construction, with energization planned for 2027. Sweetwater 1, the first phase, energized in April 2026.
How much power is contracted for Sweetwater 2?
600 MW, under a binding grid connection agreement signed on 17 March 2025 that brought IREN's West Texas total to 2.75 GW.
Which county is the Sweetwater campus in?
Fisher County, near Hamlin. Sweetwater is the campus and market name; the town of Sweetwater itself is in Nolan County.
How will Sweetwater 2 connect to the grid?
Directly to ERCOT, through a 1,400 MW bulk substation at 345 kV and 138 kV with 138/34.5 kV primary substations behind it.