Element Critical Chicago Two
341 Haynes Dr, Wood Dale, IL, 60191, US
Carriers on-net
3
Colocation space
45,000
sq ft
Power capacity
5 MW
Cloud on-ramps
5
AWS · Azure · Google · Oracle · IBM
Element Critical Chicago Two at 341 Haynes Drive completes the Wood Dale campus — 45,000 sq ft with 26,000 sq ft of raised floor and 5 MW available in N, N+1 or 2N configurations behind a 2N design with dual substations. It shares the campus's eight-carrier lineup, AWS/Azure/Google/IBM/Oracle cloud on-ramps, high-efficiency air-cooled chillers, and 100% uptime SLA, at densities from 2 to 20+ kW per rack.
Facility Specifications
Site information
- Colocation space
- 45,000 sq ft property; 26,000 sq ft raised floor
- Power capacity
- 5 MW (N / N+1 / 2N configurations); dual substations
- Power density
- 2–20+ kW/rack air-cooled
- Uptime SLA
- 100% uptime SLA
Power & cooling
- Redundancy
- 2N redundant design; dual substations
- Cooling
- High-efficiency air-cooled chillers; N+20% unit redundancy
Compliance
SOC 1 Type I & II
SOC 2 Type I & II
ISO 27001
PCI-DSS
HIPAA
Platforms & amenities
- Platforms & services
- Colocation (cabinets to suites); interconnection
- Amenities
- Campus pairing with Chicago One for in-metro redundancy
Network ecosystem — 3 carriers on-net
Cloud on-ramps
AWS
Azure
Google
Oracle
IBM
AWS, Azure, Google Cloud, IBM & Oracle on-ramps; 8 on-net carriers (AT&T, Lumen, Comcast, Crown Castle, Verizon, Zayo, Cogent, Megaport)
Request a Quote
Quote request for: Element Critical Chicago Two view facility