Templus Malaga MAL01

Calle Eduardo Queipo de Llano 57, Guadalhorce, Malaga, 29004, ES

Get a quote

Metro: Málaga, ES Country: Spain Region: Europe

Carriers on-net
12
Colocation space
400
Power capacity
2.8 MW

MAL01 sits in the Guadalhorce industrial estate on the western edge of Malaga, at Calle Eduardo Queipo de Llano Caballero 59, and it is the smallest of Templus's Spanish sites by IT floor - 400 sq m of technical surface inside roughly 2,200 sq m of building after the expansion Templus paid 15 million euros for in November 2024, which added a third data room of 40 racks. Total power is 2.8 MW on the operator's own page for the site, and racks are sold in a 2 kW to 12 kW band. Supply is entirely renewable and part of it is generated on site: this is the only Templus building with its own photovoltaic plant. Interconnection is regional rather than metropolitan - twelve networks, one exchange and one carrier are present, against MAD01's 20 MW and BCN02's 5.7 MW, which are the platform's volume sites. Templus was assembled by ICG and Teras Capital out of the Spanish telco Avatel's data centre business in February 2024. A further expansion started in April 2026. The Tier III Ready description Templus uses is a design claim, not an award.

Facility Specifications

Site information

Colocation space
400 m² (4,300 sq ft) IT surface within 2,200 m²
Power capacity
2.8 MW
Power density
2-12 kW per rack

Power & cooling

Redundancy
Operator-stated Tier III Ready design; no Uptime Institute award on record

Platforms & amenities

Platforms & services
Colocation, interconnection, high-density and GPU hosting, Smart Hands

Network ecosystem — 12 carriers on-net

1 Tier 1 & transit
11 Regional & enterprise

Notable: Cogent Communications (AS174)


Request a Quote

Quote request for: Templus Malaga MAL01 view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

How dense can a rack go at MAL01?
Templus publishes a band of 2 kW to 12 kW per rack, against total site power of 2.8 MW.
Where does the site's power come from?
Entirely renewable supply, with part of it generated on site - MAL01 is the only Templus building with its own photovoltaic plant. The serving utility and substation are not published.
What did the November 2024 expansion add?
15 million euros bought and expanded the asset, adding a third data room of 40 racks and taking the building to roughly 2,200 sq m in total. A further expansion started in April 2026, aimed at taking hosted companies from about 100 to about 300.
Which company owns Templus?
ICG and Teras Capital, who created the platform after acquiring the data centre business of the Spanish telco Avatel in February 2024 and launched it on 22 May 2024 with five sites and 15 MW installed.
How interconnected is MAL01?
Twelve networks, one internet exchange and one carrier are recorded at the facility. It is carrier-neutral and joined to the Templus pan-European network, but it is a regional hub rather than a metropolitan interconnection point.