Tydal Data Center

Stugudalsvegen 190, Tydal, 7590, NO

Get a quote

Metro: Trondheim, NO Country: Norway Region: Europe

Power capacity
225 MW

Tydal municipality in Trondelag holds 225 MW of installed capacity that Bitdeer energised in 2022 for bitcoin mining and is now converting to AI and HPC work. Power comes from local hydropower through a substation Bitdeer built for the site. A sixteen-year lease covering 121 MW, announced on 4 August 2026 and valued at US$4.7 billion, sits behind a December 2026 target of 180 MW gross installed. The Norwegian company is Tydal Data Center AS, founded by Lars Naas and Haakon Bryhni. Bitdeer's other Norwegian site, 84 MW at Elnesvagen near Molde, dates from 2019.

Facility Specifications

Site information

Power capacity
225 MW installed; 180 MW gross of AI and HPC capacity targeted for December 2026

Request a Quote

Quote request for: Tydal Data Center view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

How much power does the Tydal site have?
225 MW installed since 2022, with 180 MW gross of AI and HPC capacity targeted for December 2026.
Which company holds the Tydal site?
Bitdeer Technologies Group, through its wholly owned Norwegian subsidiary Tydal Data Center AS, under Norwegian AI Technology.
What is the Tydal lease worth?
US$4.7 billion over sixteen years for 121 MW of AI and HPC capacity, announced on 4 August 2026 after an earlier lease announcement in June.
How does Tydal differ from Bitdeer's Elnesvagen site?
Elnesvagen, near Molde in Hustadvika, is a separate 84 MW site established in 2019 and about 200 km away. Tydal is the larger of the two at 225 MW and the one being converted to AI work.