Amazon AWS – Lake Anna Tech Campus

Kentucky Springs Rd & Haley Dr, Mineral, VA, 23117, US

Get a quote

Metro: Richmond, VA, US Country: United States Region: North America

Power capacity
420 MW

Seven water-cooled data centre buildings are going up on 153 acres at the corner of Kentucky Springs Road and Haley Drive, near Mineral in Louisa County, alongside an administration building and two specialty halls. Construction began in mid-November 2024 under Clark Construction and has passed two million work hours; the first building is scheduled to open in August 2026 and the rest follow over three to four years. More than 1.7 million sq ft is planned. Power arrives through two substations built on the site itself, one Dominion Energy's and one Rappahannock Electric Cooperative's, each rated at 300 MW, against a disclosed campus minimum of 420 MW. Water is the harder problem: wells serve the ground now, and Louisa County is building a raw water line of eleven to twelve miles from Northeast Creek Reservoir for a January 2027 target, against an average draw of 630,000 gallons a day at full buildout. Amazon announced $11 billion for Louisa County in September 2023, covering this campus and North Creek.

Facility Specifications

Site information

Colocation space
More than 1.7 million sq ft planned across seven buildings
Power capacity
420 MW minimum disclosed

Request a Quote

Quote request for: Amazon AWS – Lake Anna Tech Campus view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

What stage has the Lake Anna Technology Campus reached?
Under construction since mid-November 2024 and about 60% complete, with more than two million work hours logged and the first of seven buildings scheduled to open in August 2026.
Which utilities feed the Mineral campus?
Two substations built on the site, one owned by Dominion Energy and one by Rappahannock Electric Cooperative, each capable of 300 MW.
How will the Lake Anna campus get its water?
On-site wells at first, then a raw water line of eleven to twelve miles that Louisa County is building from Northeast Creek Reservoir for January 2027. Average draw at full buildout is put at 630,000 gallons a day, and the site has storage tanks and a rainwater harvesting pond.
How much has Amazon committed in Louisa County?
$11 billion, announced in September 2023 across this campus and the North Creek Technology Campus. Louisa County separately approved an $88 million infrastructure partnership in November 2024.
What planning route did the campus take?
By right, inside Louisa County's technology overlay district, so no conditional use permit was needed for either of the two Amazon campuses in the county.