Power capacity
770 MW

Amazon's Caroline County campus sits on Orrock Lane and Stonewall Jackson Road outside Woodford, and nothing is built on it yet. Amazon Data Services holds seven Caroline parcels totalling 984.89 acres; the scheme as filed runs to 1,143 acres over thirteen holdings and crosses the county line into Spotsylvania. The joint permit application lodged with the US Army Corps of Engineers in February 2025 describes eleven two-storey data centre buildings and an office building, roughly 4.5 million sq ft, with three substation pads and an on-site water treatment plant; cooling water would come from Spotsylvania County's municipal supply. Capacity is given as a minimum of about 770 MW by 2027. Sargent Corporation has the earthworks contract and puts the first phase, some 1,300 acres of grading, on a March 2027 completion. Behind that sit a June 2023 rezoning, land bought through 2023 and 2024, an incentives package agreed in November 2024, and a Corps comment period that closed on 15 March 2025. The contractor calls the project Mattameade; it also travels as Orrock Tech Campus.

Facility Specifications

Site information

Colocation space
About 4.5 million sq ft planned across 11 buildings
Power capacity
770 MW minimum as filed

Request a Quote

Quote request for: Amazon AWS IAD – Mattermeade Campus view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

What is planned on the Woodford site?
Eleven two-storey data centre buildings and an office building, about 4.5 million sq ft in all, with three substation pads and an on-site water treatment plant.
How much capacity is disclosed for the Caroline County campus?
A minimum of roughly 770 MW by 2027, the figure carried in the Army Corps joint permit application filed in February 2025.
When is the first phase of Mattameade due?
March 2027 for Phase 1 earthwork, which Sargent Corporation is running across about 1,300 acres for Amazon Data Services.
How much land does the project cover?
984.89 acres in Caroline County across seven holdings, inside a scheme of 1,143 acres and thirteen holdings that also reaches into Spotsylvania County.
Where would the campus take its cooling water?
From Spotsylvania County's municipal supply, with an on-site treatment plant included in the permit application and wetland and stream mitigation credits filed alongside it.