EdgeConneX Tel Aviv – Rishon LeTsiyon

within the proximity of Tel Aviv, Rishon Letsiyon, 7570647, IL

Get a quote

Metro: Rosh Haayin, Israel, IL Country: Israel Region: Asia

Power capacity
7.5 MW

Rishon LeZion is a city in its own right south of Tel Aviv, and the EdgeConneX facility there carries 7.5 MW of IT capacity - the largest single block in the operator's Israeli portfolio, which the same build took to 14.5 MW in total. It followed an announcement on 25 April 2023 that put the live date in Q3 2023, and EdgeConneX now lists the site among its open and operational Israeli locations alongside Herzliya and Petah Tikva, with further capacity coming at Neve Yamin. The whole Israeli estate arrived with the purchase of Global Data Center. EdgeConneX publishes no site code and no street address for the Rishon building; its two coded Israeli facilities, EDCTLV01 in Herzliya and EDCTLV11 in Petah Tikva, carry two networks and none respectively, so the peering pitch is worth testing against what a buyer actually needs on the floor.

Facility Specifications

Site information

Power capacity
7.5 MW IT capacity

Request a Quote

Quote request for: EdgeConneX Tel Aviv – Rishon LeTsiyon view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

How much capacity does EdgeConneX run at Rishon LeZion?
7.5 MW of IT capacity, which took the operator's Israeli total to 14.5 MW.
Which site code does the Rishon LeZion facility use?
EdgeConneX publishes none for it. Its two coded Israeli sites are EDCTLV01 in Herzliya and EDCTLV11 in Petah Tikva.
Why is the site marketed as Tel Aviv?
Tel Aviv is EdgeConneX's market name for its Israeli cluster, which also covers Herzliya, Petah Tikva and Neve Yamin. The building is in Rishon LeZion, a separate city to the south.
When did the Rishon LeZion facility come online?
EdgeConneX announced the 7.5 MW build on 25 April 2023 with a third-quarter live date, and lists the site as open and operational.