STACK Infrastructure DFW02 Campus

1000 E Beltline Road, Lancaster, TX, 75146, US

Get a quote

Metro: Dallas, TX, US Country: United States Region: North America

Lancaster, at the southern end of Dallas County, is where STACK put its DFW02 campus: 193 acres along E Beltline Road, with two-storey computer buildings registered at 1000 and 1100 E Beltline Road. The first runs to 360,028 sq ft and started in May 2025 against a March 2027 completion date; the second, 360,044 sq ft and a $202 million job against $79.7 million for its predecessor, broke ground in January 2026 for March 2028. STACK plans upwards of 300 MW of critical capacity on the site and describes room to grow past 500 MW. Two cautions come with the code. STACK itself used DFW02 for a Plano site in Collin County during 2022 before bringing the name south, so early references describe different ground; and QTS is building its own DFW2-numbered project in Lancaster, a $290 million scheme in the same city and county.

Facility Specifications

Site information

Power capacity
300+ MW planned, up to 500+ MW at full build

Request a Quote

Quote request for: STACK Infrastructure DFW02 Campus view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

What stage has STACK's Lancaster campus reached?
Under construction. The first building started in May 2025 for completion in March 2027, and the second started in January 2026 for March 2028.
How much power is planned for DFW02?
Upwards of 300 MW of critical capacity, with STACK describing expansion room beyond 500 MW across the 193 acres.
Which Dallas-area suburb holds the DFW02 campus?
Lancaster, in Dallas County, on E Beltline Road. STACK used the same code for a Plano project in Collin County in 2022, so the label alone does not fix the location.
How large are the two registered buildings?
360,028 sq ft and 360,044 sq ft, both two storeys - about 720,000 sq ft between them.
Which other operator is building under a DFW2 code in Lancaster?
QTS, on a separate $290 million project in the same city.