MTN Sifiso Dabengwa Data Centre

29 Ajao Rd, Ikeja, 101233, NG

Get a quote

Metro: Lagos, Nigeria, NG Country: Nigeria Region: Africa

Power capacity
4.5 MW

MTN Nigeria opened the Dabengwa Data Center in Ikeja, Lagos on 1 July 2025, naming it for the late Sifiso Dabengwa, a former chief executive of the MTN group. Phase one fills three floors with 780 racks at 4.5 MW of IT load, heading for 9 MW at full build, against a stated investment of US$235 million. Uptime Institute certified DC01 as a constructed Tier III facility and separately certified the design documents for DC01 and a second hall, DC02, which is not yet built.

Facility Specifications

Site information

Power capacity
4.5 MW IT load in phase one, 9 MW at full build

Compliance

Uptime Tier III Constructed Facility Uptime Tier III Design Documents

Request a Quote

Quote request for: MTN Sifiso Dabengwa Data Centre view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

Whose name does the Dabengwa Data Center carry?
Sifiso Dabengwa, a former chief executive of MTN Group, who died in 2024. MTN Nigeria named the Ikeja building for him at the launch on 1 July 2025.
How much IT load does the Ikeja building carry?
4.5 MW across 780 racks on three floors in phase one, designed to reach 9 MW when the building is fully fitted out.
Which Uptime certifications does DC01 hold?
A Tier III Certification of Constructed Facility. The companion Tier III Certification of Design Documents covers DC01 together with DC02, a second hall that exists on paper only.
What did MTN spend on the Lagos data centre?
US$235 million, roughly N181 billion, on a build MTN Nigeria owns outright and runs for its own services rather than as a merchant site.
Who should an enterprise buyer contact about the Ikeja facility?
MTN Business, the enterprise arm of MTN Nigeria Communications PLC, which holds the building and the Uptime awards on it.