Microsoft Orchard Pkwy Campus

2515 Orchard Pkwy, San Jose, CA, 95131, US

Get a quote

Metro: Santa Clara, CA, US Country: United States Region: North America

Colocation space
631,278
sq ft
Power capacity
97.8 MW

San Jose Data Center 04 is Microsoft's proposal for the north-west corner of Orchard Parkway and Component Drive in San Jose: two four-storey buildings of about 315,639 gross sq ft each, on two lots to be merged into one. Maximum electrical demand is filed at 97.8 MW, backed by thirty-two 3 MW Tier 4 diesel generators with catalytic reduction and particulate filters. Pacific Gas and Electric would serve it through an on-site substation and switching station. The California Energy Commission has had the case open since 2022 and still lists it under review.

Facility Specifications

Site information

Colocation space
~631,278 sq ft across two buildings
Power capacity
97.8 MW maximum electrical demand

Request a Quote

Quote request for: Microsoft Orchard Pkwy Campus view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

What has Microsoft proposed at Orchard Parkway and Component Drive?
San Jose Data Center 04 - two four-storey buildings of about 315,639 gross sq ft each, on two lots that would be merged into one.
How much power would San Jose Data Center 04 draw?
97.8 MW of maximum electrical demand, the figure filed with the California Energy Commission.
What backup generation is planned for the Orchard Parkway site?
Thirty-two 3 MW primary generators plus four smaller sets, all Tier 4 diesel fitted with selective catalytic reduction and particulate filters.
What stage is the Orchard Parkway project at?
Under review at the California Energy Commission, which opened the case in 2022 and was still logging activity on it in August 2026.