Meta Prineville – Building 3

800 SW Connect Way, Prineville, OR, 97754, US

Get a quote

Metro: Prineville, OR, US Country: United States Region: North America

Prineville was Meta's first custom-built data centre anywhere, and the third building on the 735 SW Connect Way campus was announced in June 2014, midway through a build-out that now runs to eleven buildings and nearly 4.6 million sq ft. Ground was broken in Crook County in 2010 and the first halls came online in 2011. Later buildings average around 450,000 sq ft, so this one predates the larger standard footprint. Meta has spent more than $2 billion at Prineville and publishes no per-building floor area or capacity. Cooling draws on wells kept apart from Prineville's municipal supply, and withdrawal peaked at 117.5 million gallons in 2020 before falling; Meta and Apple together funded the town's aquifer storage and recovery scheme, which banks winter water for summer use.

Facility Specifications

Site information

Colocation space
Campus: 11 buildings, ~4.6 million sq ft

Request a Quote

Quote request for: Meta Prineville – Building 3 view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

How many buildings does Meta run at Prineville?
Eleven, totalling nearly 4.6 million sq ft as of the March 2021 expansion announcement.
When was the third Prineville building announced?
June 2014, four years after the campus broke ground and three after the first halls came online.
Where does the campus get its cooling water?
From wells kept apart from Prineville's municipal supply, backed by an aquifer storage and recovery system that Meta and Apple funded.
How much water has the site used?
Withdrawal peaked at 117.5 million gallons in 2020 and has been reduced since.