Henry County's first data centre campus was approved on 28 March 2025, when Hampton officials granted a conditional use permit over 133 acres north of Georgia 20 at McDonough Street. The plan is three buildings of about 195,000 sq ft each, roughly 585,000 sq ft in total, served by a new electrical substation to be built on the site. That land sits inside the 900-acre Henderson Farms mixed-use project, which had never been built on before the approval. Southeast Property Holdings LLC is the applicant and landholding vehicle rather than an operator, and the end user has stayed out of the public record entirely. Construction activity was reported through July 2026.

Facility Specifications

Site information

Colocation space
Three buildings of about 195,000 sq ft each, roughly 585,000 sq ft

Request a Quote

Quote request for: Henderson Farms Campus DC1 view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

What stage is the Henderson Farms campus at?
Approved and in construction. Hampton granted a conditional use permit on 28 March 2025 and site activity was reported through July 2026; nothing is in service.
How big is the approved Hampton campus?
133 acres carrying three buildings of about 195,000 sq ft each, with a new electrical substation to be built on the site.
Which company will operate the Henderson Farms campus?
The end user has stayed out of every public record so far. Southeast Property Holdings LLC, the name on the permit, is a landholding vehicle rather than a data centre operator.
How much power will the Hampton campus draw?
The published record covers 133 acres, three buildings and a dedicated on-site substation, with no megawatt figure attached to any of them.