Cologix COL5

6787 Green Meadows Drive, Lewis Center, OH, 43035, US

Get a quote

Metro: Columbus, OH, US Country: United States Region: North America

Colocation space
60,000
sq ft
Power capacity
25 MW
Cloud on-ramps
2
AWS · Google

COL5 is Cologix's newest Columbus-area building, under construction at 6787 Green Meadows Drive in Orange Township north of the city, with first service targeted for the second half of 2026. The first phase is roughly 60,000 square feet in a single data hall against 25 MW of utility power fed by a redundant loop from an AEP substation, with a second phase adding a further 95 MW. It is designed across an unusually wide density band, five to a hundred kilowatts per cabinet, with both air and liquid cooling — what a building needs to take conventional colocation and GPU training capacity under one roof. Construction uses low-carbon concrete, and the mechanical plant runs a closed loop that minimizes water draw. Three diverse fiber entrances, each with its own minimum point of entry fed from a separate zero manhole, reach the Scherers Court campus, Ohio IX and on-ramps to AWS Direct Connect and Google Cloud Platform.

Facility Specifications

Site information

Colocation space
60,000 sq ft in one data hall (first phase, under construction)
Power capacity
25 MW (first phase); 95 MW in a planned second phase
Power density
5 to 100 kW per cabinet (design range)
Uptime SLA
100% uptime SLA on redundant power circuits; 99.99% on non-redundant

Power & cooling

Redundancy
Mitsubishi UPS with MTU generators; redundant power loop from an AEP substation
Cooling
Air and liquid cooling on a closed-loop mechanical system

Platforms & amenities

Platforms & services
Custom cabinets and secure cages up to 52 RU; 100G Cologix Access Marketplace; three diverse fiber entrances with three minimum points of entry fed from three separate zero manholes
Amenities
Low-carbon concrete construction; closed-loop cooling for minimal water use; two EV charging stations; LED lighting on occupancy sensors; mantrap with badge, PIN and biometric access; 24/7/365 on-site security personnel; CCTV

Cloud on-ramps

AWS Google

Direct fiber access to 50+ networks; direct access to Ohio IX; on-ramps to AWS Direct Connect and Google Cloud Platform


Colocation Packages

Package Size Power Bandwidth Price (USD/mo) Term Setup Quote
42U Private Cabinet — 5 kW (208V A+B Redundant) 42U — Private 5 kW · 208V A+B Request

Request a Quote

Quote request for: Cologix COL5 view facility
We'll route your request to the facility and email you a copy.

Map

Interactive map

Frequently asked questions

Where is Cologix COL5 located?
Cologix COL5 is a colocation data center located at 6787 Green Meadows Drive, Lewis Center, OH, US.
How much space and power does Cologix COL5 offer?
Cologix COL5 offers 60,000 sq ft in one data hall (first phase, under construction) with 25 MW (first phase); 95 MW in a planned second phase of power.
How do I get a quote for colocation at Cologix COL5?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.