Apple paid for Prineville's first aquifer storage and recovery well, an $8.7 million grant that put 150 million gallons a year underground beneath the old Crooked River channel when the well finished in 2019; Meta funded the second. The campus itself sits at 1600 SW Baldwin Road on 154 developed acres, with a further 210 acres bought in September 2015 for $3.6 million. Two 330,000 sq ft halls were built, a third of the same size was permitted in 2016 alongside a 70,000 sq ft logistics building, and Apple has never published a megawatt figure for the site. Oregon certifies the campus as two projects rather than one: Apple - DC No. 1 from 12 April 2012 and DC No. 2 from 25 February 2016, both under the state's Long-Term Rural Enterprise Zone, which grants fifteen-year property tax exemptions instead of the usual three to five. Together they abated $22,126,833 of Crook County property tax in 2024-25 on exempt assessed value of $1,424,139,459. Pacific Power serves Prineville; the renewable supply is contracted separately, through Montague Wind Farm at 200.85 MW and Gala Solar at 69.9 MWdc.
Facility Specifications
Site information
Colocation space
Two 330,000 sq ft buildings on a 154-acre campus
Request a Quote
Quote request for: Apple Prineville Campus view facility
Location
Interactive map
Frequently asked questions
What did Apple pay for in Prineville's water system?
The city's first aquifer storage and recovery injection well, funded by an $8.7 million Apple grant and completed in 2019. It stores 150 million gallons a year underground. Meta paid for the second well, taking combined capacity to about 300 million gallons a year at the end of 2024.
How many Apple data centre projects does Oregon recognise in Crook County?
Two - Apple - DC No. 1, certified 12 April 2012, and Apple - DC No. 2, certified 25 February 2016. Both hold fifteen-year property tax exemptions under the Long-Term Rural Enterprise Zone, first claimed in 2014-15 and 2017-18 respectively.
How much property tax was abated on the campus in 2024-25?
$22,126,833 across the two certified projects, against combined exempt assessed value of $1,424,139,459. Between 2013 and 2017 Apple paid $491,987 in property tax on the land while $30,267,217 was abated.
Which renewable projects are contracted to the campus?
Montague Wind Farm in Gilliam County at 200.85 MW, which reached commercial operation on 24 October 2019, and Gala Solar in Crook County at 69.9 MWdc, from 31 October 2017. Pacific Power is the serving utility, and a Bonneville Power Administration substation built after Apple's arrival added 400 MW of local capacity.
What is built at 1600 SW Baldwin Road?
Two 330,000 sq ft data centre buildings, with a third of the same size and a 70,000 sq ft logistics building permitted in 2016. Apple publishes no building count, no building names and no capacity figure for the site.