Announced on 18 March 2021 alongside Building 11, this 450,000 sq ft hall was one of the two structures that closed out a Prineville campus Meta broke ground on in 2010 - eleven buildings and roughly 4.6 million sq ft at full build, and the site where the Open Compute Project began. Pacific Power carries the load, and the March 2021 announcement landed in the middle of a fight over PacifiCorp's Schedule 272 renewable tariff cap. Cooling is outside air with evaporative assist, early phases running at a PUE near 1.06, and the campus drew about 70 million gallons of water in 2024. Meta paid for the City of Prineville's second aquifer storage and recovery injection well after Apple funded the first in 2019 at a cost of $8.7 million; together the two hold roughly 300 million gallons a year, close to half the city's annual demand from its seventeen wells. Crook County's long-term rural enterprise zone exempts the campus from city and county property assessment. Meta puts its Oregon investment above $2 billion and has given more than $5.3 million to Crook County schools and nonprofits since 2011.
Facility Specifications
Site information
Colocation space
450,000 sq ft
Power & cooling
Cooling
Outside-air economiser with evaporative assist
Request a Quote
Quote request for: Meta Prineville – Building 10 view facility
Location
Interactive map
Frequently asked questions
How large is Building 10, and when was it announced?
450,000 sq ft. Meta announced it on 18 March 2021 together with Building 11, a 900,000 sq ft pair due to complete in 2023.
How many buildings does the Prineville campus hold?
Eleven, about 4.6 million sq ft in total. Ground was broken in 2010 and Buildings 10 and 11 were the last increment.
Which utility supplies the Prineville campus?
PacifiCorp, trading in Oregon as Pacific Power. Meta counts 977 MW of new renewable generation added to that grid through the projects it supports.
How much water does the site take?
About 70 million gallons across the campus in 2024. Meta funded the second of Prineville's two aquifer storage and recovery injection wells; Apple funded the first, completed in 2019, and the pair store roughly 300 million gallons a year.
What tax arrangement covers the campus?
Oregon's long-term rural enterprise zone, sponsored jointly by the City of Prineville and Crook County, giving full exemption from city and county property assessments for the agreed term.