Microsoft East Wenatchee (EAT03)
875 Urban Industrial Wy, East Wenatchee, WA, 98802, US
Colocation space
244,000+
sq ft
Microsoft bought 170 acres in the Pangborn industrial area of East Wenatchee in 2020 for $19.3 million and applied to Douglas County the following year to build the first of three data centres on it, a structure of more than 244,000 sq ft that the permit application values at $409 million. Microsoft also put $24.9 million toward a 180 MW substation and transmission line and $12.5 million toward a pump station and two-million-gallon reservoir for the East Wenatchee Water District. It buys its power on the wholesale market rather than taking Wells Dam supply as neighbouring operators do.
Facility Specifications
Site information
- Colocation space
- 244,000+ sq ft, first of three buildings
Request a Quote
Quote request for: Microsoft East Wenatchee (EAT03) view facility
Location
Frequently asked questions
How much land does Microsoft hold at East Wenatchee?
170 acres in the Pangborn industrial area, bought in 2020 for $19.3 million.
How big is the first East Wenatchee building?
More than 244,000 sq ft, valued at $409 million on the permit application Microsoft filed with Douglas County.
How does the East Wenatchee site take its power?
Microsoft buys on the wholesale market rather than taking Wells Dam supply, and paid $24.9 million toward a 180 MW substation and transmission line.
What did Microsoft contribute to water infrastructure at East Wenatchee?
$12.5 million toward a pump station and a two-million-gallon reservoir built by the East Wenatchee Water District.