365 Data Centers – Bridgewater, NJ

999 Frontier Rd, Bridgewater Township, NJ, 08807, US

Get a quote

Metro: Newark, NJ, US Country: United States Region: North America

Carriers on-net
4
Colocation space
25,600
sq ft
Power capacity
2.3 MW
Cloud on-ramps
5
AWS · Azure · Google · Oracle · IBM

Bridgewater sits on the fibre-rich Magic Mile corridor about 40 miles from Manhattan, positioned deliberately between the Philadelphia and New York footprints for continuity work. It is the ex-New York Internet building, acquired in September 2019 along with more than 120 enterprise customers, which sets it apart from its ex-SunGard sibling at Carlstadt. Roughly 300 combination-locking cabinets sit on 25,600 sq ft with 2.3 MW live and 20 MW available for expansion — the largest published headroom in the portfolio. MegaIX New York is hosted here, a Megaport PoP arrived in July 2025, and the roof is available for customer satellite equipment.

Facility Specifications

Site information

Colocation space
25,600 sq ft with approximately 300 combination-locking cabinets plus custom cages and suites
Power capacity
2.3 MW with 20 MW total available for future expansion; 120V, 208V and 208V three-phase AC

Power & cooling

Redundancy
N+1 UPS over 2 MW; 2N generators with 13,000-gallon fuel tank, 72 hours without refuelling
Cooling
300-ton plant, N+1; four 60-ton dry coolers plus three split condenser units

Compliance

PCI DSS 3.2.1 SOC 1 Type 2 (SSAE 18) SOC 2 Type 2 ISAE 3402

Platforms & amenities

Platforms & services
Colocation across cabinets, custom cages and suites; remote hands; marketed for disaster recovery and business continuity
Amenities
24x7 security and monitoring; roof access for customer satellite equipment; 24x7 5,000 lb hydraulic loading-dock lift; FM-200 in UPS rooms; zoned dry-pipe pre-action fire protection

Network ecosystem — 4 carriers on-net

Cloud on-ramps

AWS Azure Google Oracle IBM

MegaIX New York hosted in-building; Megaport PoP added July 2025 reaching AWS, Azure, Google Cloud, Oracle Cloud and IBM Cloud; 150 carrier network points of presence; AT&T, Verizon, Comcast, Crown Castle, Altice (Lightpath/ZenFi), BAI Communications, Zayo


Request a Quote

Quote request for: 365 Data Centers – Bridgewater, NJ view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

Where is 365 Data Centers – Bridgewater, NJ located?
365 Data Centers – Bridgewater, NJ is a colocation data center located at 999 Frontier Rd, Bridgewater Township, NJ, US.
How much space and power does 365 Data Centers – Bridgewater, NJ offer?
365 Data Centers – Bridgewater, NJ offers 25,600 sq ft with approximately 300 combination-locking cabinets plus custom cages and suites with 2.3 MW with 20 MW total available for future expansion; 120V, 208V and 208V three-phase AC of power.
How many carriers are on-net at 365 Data Centers – Bridgewater, NJ?
365 Data Centers – Bridgewater, NJ is connected to 4 networks, including 365 Data Centers (BroadbandONE) (AS19151), Megaport (AS49915), NetFire (AS394102), xTom United States (AS6233).
What compliance certifications does 365 Data Centers – Bridgewater, NJ support?
365 Data Centers – Bridgewater, NJ supports PCI DSS 3.2.1, SOC 1 Type 2 (SSAE 18), SOC 2 Type 2, ISAE 3402.
How do I get a quote for colocation at 365 Data Centers – Bridgewater, NJ?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.