LIS002 is the second phase of AtlasEdge's Carnaxide campus at Estrada Outurela 117a, on the western edge of Greater Lisbon, and it shares that address with LIS001, the building already running there. AtlasEdge lists the phase as planned: 4,356 m² and 16 MW when delivered, against the 3,162 m² and 5.1 MW that LIS001 operates now. With a third phase the campus is programmed to reach 30 MW. No construction start or delivery date has been issued, and the ISO 27001 and ISO 14001 certificates published for the site attach to the operating building rather than to the phase in planning. Lisbon stayed with AtlasEdge when nine of its other European data centres changed hands in 2026, so the campus and its next two phases remain under one owner.
AtlasEdge lists it as planned. Nothing has been issued on a construction start or a delivery date for the second Carnaxide building.
How large will LIS002 be when built?
4,356 m² of technical space and 16 MW, which would be roughly three times the 5.1 MW that LIS001 runs on the same ground.
Which certifications apply on the Carnaxide campus?
ISO 27001 and ISO 14001, published by AtlasEdge for the operating LIS001 building. The Tier 3 references in campus material are design language, not an Uptime Institute award.
How is the Carnaxide campus programmed to grow?
Three phases to 30 MW in total at one address: LIS001 in service, then LIS002 at 16 MW and LIS003 behind it.
Whom should a Lisbon buyer approach about capacity at Carnaxide?
AtlasEdge, which kept its Lisbon estate through the 2026 sale of nine of its sites. A similarly coded Lisbon building under a different operator is a separate address entirely.