Cogent Data Center – Franklin

254 State Highway 23, Franklin, NJ, 07416, US

Get a quote

Metro: Newark, NJ, US Country: United States Region: North America

Colocation space
6,669
sq ft

This 6,669 square foot Cogent facility sits on State Highway 23 in Franklin, in the Sussex County highlands of northwestern New Jersey. It is a deliberately out-of-metro position: about forty miles from Newark and the port, well above the harbour flood plain, on utility infrastructure entirely separate from the New York and northern New Jersey grid, yet still inside a few milliseconds of the metro carrier hotels over fibre. That combination is what a recovery or archive site is supposed to look like. The building is carrier-neutral and connects onto a Tier 1 backbone with 100GE ports available.

Facility Specifications

Site information

Colocation space
6,669 sq ft
Power capacity
Multiple power configurations available, backed by UPS and standby generator

Power & cooling

Cooling
HVAC environmental control with fire detection and suppression

Platforms & amenities

Platforms & services
Colocation cabinets and cages; Cogent IP transit, dedicated internet access, Ethernet and optical wavelengths
Amenities
Sussex County highlands siting above the harbour flood plain on separate utility infrastructure; 24/7/365 building security, controlled access and IP camera surveillance

Colocation Packages

Package Size Power Bandwidth Price (USD/mo) Term Setup Quote
42U Private Cabinet — 5 kW (208V A+B Redundant) 42U — Private 5 kW · 208V A+B Request

Request a Quote

Quote request for: Cogent Data Center – Franklin view facility
Selected package: 42U Private Cabinet — 5 kW (208V A+B Redundant) change
We'll route your request to the facility and email you a copy.

Map

Interactive map

Frequently asked questions

Where is Cogent Data Center – Franklin located?
Cogent Data Center – Franklin is a colocation data center located at 254 State Highway 23, Franklin, NJ, US.
How much space and power does Cogent Data Center – Franklin offer?
Cogent Data Center – Franklin offers 6,669 sq ft with Multiple power configurations available, backed by UPS and standby generator of power.
How do I get a quote for colocation at Cogent Data Center – Franklin?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.