Cogent Data Center – Milwaukee 2

2915 S 5th Ct, Milwaukee, WI, 53207, US

Get a quote

Metro: Milwaukee, WI, US Country: United States Region: North America

Colocation space
5,831
sq ft

Cogent's south side Milwaukee facility is 5,831 square feet at 2915 South 5th Court. Milwaukee sits ninety miles north of Chicago, which is the whole point: close enough that latency to the Chicago carrier hotels is negligible, far enough to be on separate utility infrastructure and outside whatever affects the Illinois grid. For Wisconsin manufacturers, insurers and health systems that would otherwise haul everything to Chicago, a local Tier 1 on-ramp removes both the circuit cost and the dependency. Lake Michigan also moderates the climate for cooling. Wave capacity runs south along the Chicago path.

Facility Specifications

Site information

Colocation space
5,831 sq ft
Power capacity
Multiple power configurations available, backed by UPS and standby generator

Power & cooling

Cooling
HVAC environmental control with fire detection and suppression

Platforms & amenities

Platforms & services
Colocation cabinets and cages; Cogent IP transit, dedicated internet access, Ethernet and optical wavelengths
Amenities
South side Milwaukee siting on separate utility infrastructure from the Illinois grid; 24/7/365 building security, controlled access and IP camera surveillance

Colocation Packages

Package Size Power Bandwidth Price (USD/mo) Term Setup Quote
42U Private Cabinet — 5 kW (208V A+B Redundant) 42U — Private 5 kW · 208V A+B Request

Request a Quote

Quote request for: Cogent Data Center – Milwaukee 2 view facility
Selected package: 42U Private Cabinet — 5 kW (208V A+B Redundant) change
We'll route your request to the facility and email you a copy.

Map

Interactive map

Frequently asked questions

Where is Cogent Data Center – Milwaukee 2 located?
Cogent Data Center – Milwaukee 2 is a colocation data center located at 2915 S 5th Ct, Milwaukee, WI, US.
How much space and power does Cogent Data Center – Milwaukee 2 offer?
Cogent Data Center – Milwaukee 2 offers 5,831 sq ft with Multiple power configurations available, backed by UPS and standby generator of power.
How do I get a quote for colocation at Cogent Data Center – Milwaukee 2?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.