Cogent Data Center – Vienna
1921 Gallows Rd, Vienna, VA, 22182, US
Colocation space
6,349
sq ft
Cogent's Vienna facility is 6,349 square feet at 1921 Gallows Road, inside the Tysons corridor in Fairfax County. Northern Virginia is the largest data centre market on earth, but almost all of that capacity sits twenty-five miles west in Loudoun County, built for hyperscale tenants taking megawatts at a time. Tysons is a different market: professional services firms, federal contractors and technology companies whose staff work in the corridor and who need a cabinet or a cage rather than a hall. Being east of the Beltway sprawl also means reaching the equipment without the Route 28 commute. Ports run to 100GE and other networks sit in the building alongside Cogent.
Facility Specifications
Site information
- Colocation space
- 6,349 sq ft
- Power capacity
- Multiple power configurations available, backed by UPS and standby generator
Power & cooling
- Cooling
- HVAC environmental control with fire detection and suppression
Platforms & amenities
- Platforms & services
- Colocation cabinets and cages; Cogent IP transit, dedicated internet access, Ethernet and optical wavelengths
- Amenities
- Complimentary WiFi; Tysons corridor siting inside the Capital Beltway; 24/7/365 building security, controlled access and IP camera surveillance
Colocation Packages
| Package | Size | Power | Bandwidth | Price (USD/mo) | Term | Setup | Quote |
|---|---|---|---|---|---|---|---|
| 42U Private Cabinet — 5 kW (208V A+B Redundant) | 42U — Private | 5 kW · 208V A+B | Request |
Request a Quote
Quote request for: Cogent Data Center – Vienna view facility
Selected package:
42U Private Cabinet — 5 kW (208V A+B Redundant)
change
- Size42U — Private
- Power5 kW
- Power Type208V A+B
Map
Frequently asked questions
Where is Cogent Data Center – Vienna located?
Cogent Data Center – Vienna is a colocation data center located at 1921 Gallows Rd, Vienna, VA, US.
How much space and power does Cogent Data Center – Vienna offer?
Cogent Data Center – Vienna offers 6,349 sq ft with Multiple power configurations available, backed by UPS and standby generator of power.
How do I get a quote for colocation at Cogent Data Center – Vienna?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.