Iron Mountain Data Centers MIA-1
2925 NW 120th Terrace, Miami, FL, 33167, US
Colocation space
150,000
sq ft
Power capacity
16 MW
Iron Mountain MIA-1 at 2925 NW 120th Terrace is a 150,000 sq ft AI-ready data center under construction in Central Northwest Miami, with completion expected in 2026. The purpose-built Tier III facility is designed for 16 MW of customer IT load on 26 MVA of redundant operational power, Category 5 hurricane-rated construction, and high-density GPU-ready configurations. Positioned as a gateway to Latin America and the Caribbean, it offers connectivity toward the NAP of the Americas and access to the region's dense submarine cable ecosystem.
Facility Specifications
Site information
- Colocation space
- 150,000 sq ft AI-ready facility (3.4-acre site)
- Power capacity
- 16 MW customer IT load; 26 MVA total redundant operational power; 100% renewable-matched
- Power density
- High-density, GPU-ready configurations
- Year built
- 2026 (completion expected)
Power & cooling
- Redundancy
- Purpose-built Tier III; diverse utility feeds; Category 5 hurricane-rated construction
Compliance
HIPAA
FISMA High
PCI-DSS
ISO 27001
SOC 2 Type II
SOC 3
BREEAM
Platforms & amenities
- Platforms & services
- Colocation; interconnection; AI/GPU-ready deployments
- Amenities
- 24/7/365 on-site monitoring & security; conference rooms & offices; loading dock; Smart Hands