Meta Temple – Building 1

3101 Industrial Blvd, Temple, TX, 76502, US

Get a quote

Metro: Burlington, TX, US Country: United States Region: North America

Colocation space
760,000+
sq ft
Power capacity
152 MW

Two of the three structures Meta built at Eberhardt Road and Industrial Boulevard in Temple are data centres; the third is administrative. The campus went live on 22 July 2026 with more than 760,000 sq ft across the pair, heading for roughly 900,000 sq ft at full build-out on a 393-acre site in Bell County. Announced on 31 March 2022 at $800 million, it was redesigned mid-build for AI workloads and had cost more than $1.2 billion by the time it opened. The campus is rated at 152 MW, and its construction scope included about 25 miles of underground conduit and 750 prefabricated multi-trade racks; no per-building split has been published. Cooling is dry, using outside air for at least half the year, which Meta puts at 80% better on water efficiency than an average data centre. Peak construction employment ran to about 1,200 and roughly 100 permanent roles remain.

Facility Specifications

Site information

Colocation space
760,000+ sq ft across two buildings
Power capacity
152 MW campus

Power & cooling

Cooling
Dry cooling, outside air

Request a Quote

Quote request for: Meta Temple – Building 1 view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

How many data centre buildings are on the Temple campus?
Two. A third structure completes the campus but holds administrative space rather than data halls.
When did Temple come online?
22 July 2026, after breaking ground in 2022 and a mid-build redesign for AI workloads.
How is the campus cooled?
Dry cooling drawing on outside air for at least half the year. Meta puts it at least 80% more water-efficient than an average data centre.
What did the campus cost?
More than $1.2 billion, up from the $800 million announced on 31 March 2022.