US Signal Chicago IL01
810 Jorie Blvd, Oak Brook, IL, 60523, US
Power capacity
250 kW
US Signal IL01 at 810 Jorie Blvd in Oak Brook is the company's Chicago-metro interconnection site, with ten on-net carriers — the most of any US Signal facility — in a building dating to 1962 and remodeled in 2015. The Tier 2 facility runs 250 kW of UPS (expandable to 500 kW) with a 450 kW generator on 750 kVA feeds and 75 tons of N+1 cooling under a 99.995% uptime SLA, with meet-me cabinets, man-trap entry, and cage and cabinet deployments.
Facility Specifications
Site information
- Power capacity
- UPS 250 kW (expandable to 500 kW); generator 450 kW; 750 kVA utility feeds
- Year built
- 1962 (remodeled 1992, 2015)
- Uptime SLA
- 99.995% uptime SLA
Power & cooling
- Redundancy
- Tier 2 resiliency
- Cooling
- 75 tons HVAC (N+1); clean agent fire suppression
Compliance
SSAE 18 SOC 1 Type 2
SOC 2 Type 2
HIPAA/HITECH
PCI-DSS
FBI CJIS
GDPR Privacy Shield
ITAR
Platforms & amenities
- Platforms & services
- Colocation (cages & cabinets); managed bandwidth; cloud & IaaS platform
- Amenities
- Man-trap; biometric segmented access; 24/7 TOC surveillance; conference room; loading dock
Request a Quote
Quote request for: US Signal Chicago IL01 view facility