ValorC3 Saint George Data Center

1108 West 1600 South, Bldg D, St George, UT, 84770, US

Get a quote

Metro: St George, UT, US Country: United States Region: North America

Carriers on-net
9
Power capacity
2 MW
Cloud on-ramps
3
AWS · Azure · Google

STG-1 is ValorC3's St. George building at 1108 West 1600 South in southern Utah, Building D on a site operating since 2008 and outside the Wasatch Fault zone. The building draws on a 23 MW municipal substation backed by a 15 MW redundant substation, with 2 MW of critical load installed and 1 MW available to new tenants today. Cabinets run from 2 kW to 30 kW air-cooled on A+B feeds behind redundant UPS and N+1 generators. Nine networks and two exchanges meet here, with Lumen, Zayo, TDS and CentraCom on site and Megaport reaching AWS, Azure and Google Cloud at 5 ms to Las Vegas and 14 ms to Salt Lake City. KirkpatrickPrice audits the building for SOC 1 Type II and SOC 2 Type II. Tonaquint, bought by DIF Capital Partners at the start of 2023, took the ValorC3 name on January 20, 2025. Buyers take half or full cabinets or a private cage.

Facility Specifications

Site information

Power capacity
2 MW critical load, 1 MW available
Power density
2 kW to 30 kW per cabinet

Power & cooling

Redundancy
Redundant UPS, N+1 generators, A+B cabinet power
Cooling
CRAC units, air-cooled to 30 kW

Compliance

SOC 1 Type II SOC 2 Type II

Platforms & amenities

Platforms & services
Megaport, blended IP transit, MMR cross-connects

Network ecosystem — 9 carriers on-net

Cloud on-ramps

AWS Azure Google

9 networks, 2 IX, Lumen, Zayo, TDS, CentraCom, Megaport to AWS, Microsoft Azure, Google Cloud