ValorC3 Saint George Data Center
1108 West 1600 South, Bldg D, St George, UT, 84770, US
STG-1 is ValorC3's St. George building at 1108 West 1600 South in southern Utah, Building D on a site operating since 2008 and outside the Wasatch Fault zone. The building draws on a 23 MW municipal substation backed by a 15 MW redundant substation, with 2 MW of critical load installed and 1 MW available to new tenants today. Cabinets run from 2 kW to 30 kW air-cooled on A+B feeds behind redundant UPS and N+1 generators. Nine networks and two exchanges meet here, with Lumen, Zayo, TDS and CentraCom on site and Megaport reaching AWS, Azure and Google Cloud at 5 ms to Las Vegas and 14 ms to Salt Lake City. KirkpatrickPrice audits the building for SOC 1 Type II and SOC 2 Type II. Tonaquint, bought by DIF Capital Partners at the start of 2023, took the ValorC3 name on January 20, 2025. Buyers take half or full cabinets or a private cage.
Facility Specifications
Site information
- Power capacity
- 2 MW critical load, 1 MW available
- Power density
- 2 kW to 30 kW per cabinet
Power & cooling
- Redundancy
- Redundant UPS, N+1 generators, A+B cabinet power
- Cooling
- CRAC units, air-cooled to 30 kW
Compliance
Platforms & amenities
- Platforms & services
- Megaport, blended IP transit, MMR cross-connects
Network ecosystem — 9 carriers on-net
Cloud on-ramps
9 networks, 2 IX, Lumen, Zayo, TDS, CentraCom, Megaport to AWS, Microsoft Azure, Google Cloud