83,613
Power capacity
150 MW

At Lisses, in the Essonne south of Paris, CloudHQ holds consent for two data centres of 74.4 MW each, both fully permitted, taking the site to 150 MW of critical IT load over 83,613 m2. A new 225 kV substation is being built on the campus - a transmission-level connection rather than a distribution feed, which is what carrying 150 MW into the Île-de-France grid requires. CloudHQ is also laying diverse fibre ducts from the site to two separate interconnection points, so each building reaches the Paris network core by two routes. Ready-for-service is put at 22 months.

Facility Specifications

Site information

Colocation space
83,613 m2 across two permitted buildings
Power capacity
150 MW total critical IT load; 74.4 MW per building

Request a Quote

Quote request for: CloudHQ CDG2 view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

How much capacity is permitted at the Lisses campus?
Two buildings of 74.4 MW IT load each, 150 MW in total, and CloudHQ states that both are fully permitted.
What voltage will serve the Essonne site?
A new 225 kV substation built on the campus itself.
How does the Lisses campus reach the Paris interconnection points?
Through diverse fibre ducts CloudHQ is building from the site to two separate interconnection points.
How large is the CloudHQ campus at Lisses?
83,613 m2 across the two permitted buildings.