Summit Ashburn

43830 Devin Shafron Dr, Ashburn, VA, 20147, US

Get a quote

Metro: Washington, DC, US Country: United States Region: North America

Colocation space
113,300
sq ft
Power capacity
10 MW

Summit Ashburn is a 113,300-square-foot carrier-neutral colocation facility at 43830 Devin Shafron Drive in Ashburn, Virginia, operated by Summit (formerly Deft, formerly ServerCentral). The site draws 10 MW of utility power backed by 6,750 kW of 2N-redundant UPS and 12,000 kW of generator capacity, supporting densities up to 150 watts per square foot with N+1 cooling. Two diverse fiber paths connect the building to the broader Summit and Equinix IAD campuses over 10/100G waves, and it offers direct links to major carriers and public cloud providers plus dark fiber across an IPv6- and MPLS-enabled 10-GbE global IP network, with 100% power and network uptime SLAs. The LEED Silver building holds SOC 2, PCI-DSS, and GDPR compliance, with 24/7 on-site security, biometric access, crash-rated cages, remote hands, and loading docks supporting retail colocation.

Facility Specifications

Site information

Colocation space
113,300 sq ft
Power capacity
10 MW utility; 6,750 kW UPS; 12,000 kW generator
Power density
up to 150 W/sq ft
Uptime SLA
100% power and network SLA

Power & cooling

Redundancy
2N UPS, N+1 cooling
Cooling
N+1 cooling plant

Compliance

SOC 2 PCI-DSS GDPR LEED Silver

Platforms & amenities

Platforms & services
direct public cloud on-ramps
Amenities
24/7 security, biometric access, crash-rated cages, remote hands, loading docks

Colocation Packages

Package Size Power Bandwidth Price (USD/mo) Term Setup Quote
42U Private Cabinet — 5 kW (208V A+B Redundant) 42U — Private 5 kW · 208V A+B Request

Request a Quote

Quote request for: Summit Ashburn view facility
We'll route your request to the facility and email you a copy.

Map

Interactive map

Frequently asked questions

Where is Summit Ashburn located?
Summit Ashburn is a colocation data center located at 43830 Devin Shafron Dr, Ashburn, VA, US.
How much space and power does Summit Ashburn offer?
Summit Ashburn offers 113,300 sq ft with 10 MW utility; 6,750 kW UPS; 12,000 kW generator of power.
What compliance certifications does Summit Ashburn support?
Summit Ashburn supports SOC 2, PCI-DSS, GDPR, LEED Silver.
How do I get a quote for colocation at Summit Ashburn?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.