DataBank Culpeper Campus

14601 Germanna Hwy, Culpeper, VA, 11109, US

Get a quote

Metro: Charlottesville, VA, US Country: United States Region: North America

Colocation space
613,152
sq ft
Power capacity
192 MW

The Culpeper campus is DataBank's newest in Northern Virginia and its answer to the power constraint that now governs Data Center Alley: eighty-five acres less than fifty miles from the Ashburn campus, inside a designated Technology Zone with preferential tax treatment, carrying 192 megawatts of critical IT load across two buildings and up to 1.4 million raw square feet at full build. Both support 45 kW per cabinet on air and more than 100 kW liquid-cooled. For an AI or federal workload that wants Northern Virginia latency and Northern Virginia networks without the Ashburn power queue or the Loudoun County land price, Culpeper is the trade being offered, and the tax zone makes the arithmetic work.

Facility Specifications

Site information

Colocation space
613,152 sq ft IT space across two buildings; 85-acre campus, up to 1.4M raw sq ft at full build
Power capacity
192 MW combined critical IT load
Power density
45 kW+ per cabinet air-cooled; 100 kW+ liquid-cooled
Uptime SLA
100% uptime SLA

Power & cooling

Redundancy
N+1 power design
Cooling
N+1 cooling design with direct liquid cooling to the cabinet

Compliance

ISO/IEC 27001 SOC 1 SOC 2 PCI DSS HIPAA

Platforms & amenities

Platforms & services
Hall-scale and build-to-suit colocation for AI and HPC; DataBank Cloud in-metro; compliance enablement for FedRAMP, FISMA, StateRAMP and ITAR workloads
Amenities
85-acre campus in a Virginia Technology Zone with preferential tax treatment; built on DataBank's Universal Data Hall Design; 100% renewable energy; 7x24x365 operations and remote hands; smart hands by request

Request a Quote