IronGate Twin Cities West

500 Bielenberg Dr, St. Paul, MN, 55402, US

Get a quote

Metro: Minnetonka, MN, US Country: United States Region: North America

Colocation space
346,045
sq ft
Power capacity
16 MW

IronGate Twin Cities West sits at 500 Bielenberg Drive in Woodbury, Minnesota (greater St. Paul metro), a purpose-built, carrier-neutral colocation and wholesale campus operated by IronGate Data Centers. First built in 2024, the facility spans roughly 346,045 square feet across about 24 acres and is positioned adjacent to the largest fiber bandwidth routes feeding the Twin Cities. It offers approximately 16 MW today with expansion capacity toward 65 MW, drawing dual utility feeds from Xcel Energy, and supports power densities of 50-250 watts per square foot through turn-key, concurrently maintainable topologies with independently demised space for individual occupiers. It operates about 0.17 miles from IronGate's Twin Cities East building at 401 Bielenberg Drive, making the two adjacent but physically distinct facilities.

Facility Specifications

Site information

Colocation space
346,045 sq ft on ~24 acres
Power capacity
16 MW, expandable to 65 MW; dual Xcel Energy feeds
Power density
50-250 W/sq ft

Power & cooling

Redundancy
turn-key, concurrently maintainable topologies; independently demised space

Colocation Packages

Package Size Power Bandwidth Price (USD/mo) Term Setup Quote
42U Private Cabinet — 5 kW (208V A+B Redundant) 42U — Private 5 kW · 208V A+B Request

Request a Quote

Quote request for: IronGate Twin Cities West view facility
We'll route your request to the facility and email you a copy.

Map

Interactive map

Frequently asked questions

Where is IronGate Twin Cities West located?
IronGate Twin Cities West is a colocation data center located at 500 Bielenberg Dr, St. Paul, MN, US.
How much space and power does IronGate Twin Cities West offer?
IronGate Twin Cities West offers 346,045 sq ft on ~24 acres with 16 MW, expandable to 65 MW; dual Xcel Energy feeds of power.
How do I get a quote for colocation at IronGate Twin Cities West?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.