CloudHQ GIG1

R. Maria Soares Sendas, Parque Barreto, São João de Meriti, 25586-140, BR

Get a quote

Metro: Sao Joao de Meriti, BR Country: Brazil Region: South America

Colocation space
483,922
sq ft
Power capacity
36 MW

One building, 36 MW: the CloudHQ campus at São João de Meriti is the smaller of the developer's two Brazilian schemes and the only one where the campus and the data centre are the same thing. It covers 483,922 sq ft, or 49,958 m2, about 18 km out from the Rio de Janeiro metropolitan region and close to the Dutra highway, the corridor the region's long-haul fibre follows. CloudHQ puts ready-for-service at 22 months from commitment.

Facility Specifications

Site information

Colocation space
483,922 sq ft (49,958 m2)
Power capacity
36 MW critical IT load

Request a Quote

Quote request for: CloudHQ GIG1 view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

How many buildings will the São João de Meriti campus hold?
One, carrying 36 MW of critical IT load. The published campus total and the building total are the same figure.
How far is the CloudHQ site from Rio de Janeiro?
About 18 km from the Rio metropolitan region, close to the Dutra highway.
How large is the building planned at São João de Meriti?
483,922 sq ft, or 49,958 m2.
Which Brazilian campus did CloudHQ take on before São João de Meriti?
The São Paulo interior, with the larger Paulínia campus in the Campinas region. Rio is the company's second Brazilian development.