DAMAC Digital MAD01

within 10km from Madrid International Airport, Vicálvaro, 28052, ES

Get a quote

Metro: Madrid, ES Country: Spain Region: Europe

Colocation space
22,414
Power capacity
40 MW

DAMAC Digital bought powered land at Vicálvaro, in eastern Madrid, on 15 October 2024, taking the plot freehold from ActivumSG Fund VII. The scheme is drawn at 22,414 m2 of floor area for 40 MW of capacity, with DAMAC Group putting total investment above EUR 400 million. Engineering consultancy IDP was engaged for testfit work, technical due diligence and a study of fibre and energy availability - pre-construction scope, which places the site at design stage rather than in build. Go-live was framed at the time of the land deal as falling within two years. The developer is the data centre arm of Hussain Sajwani's DAMAC Group, which traded as EDGNEX Data Centres by DAMAC until 19 June 2025. Espanix, the Madrid internet exchange, sits about 5 km away, and Adolfo Suárez Madrid-Barajas roughly 10 km.

Facility Specifications

Site information

Colocation space
22,414 m2 as designed
Power capacity
40 MW as planned

Request a Quote

Quote request for: DAMAC Digital MAD01 view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

What stage has the Vicálvaro site reached?
Design and feasibility. DAMAC Digital acquired the powered land in October 2024 and engaged IDP for testfit, technical due diligence and a fibre and energy availability study; no completion has been announced since.
How much capacity is planned in Madrid?
40 MW across 22,414 m2 of floor area, on a DAMAC Group investment put at more than EUR 400 million.
Who sold the Madrid plot?
ActivumSG, acting for ActivumSG Fund VII, in a freehold sale completed on 15 October 2024.
Why do older references call the developer EDGNEX?
EDGNEX Data Centres by DAMAC renamed itself DAMAC Digital on 19 June 2025. Same company, same Madrid project.
Who handles enquiries about the Madrid project?
DAMAC Digital directly. The group develops and runs its own sites, and it has published no Madrid availability date beyond the two-year horizon given when the land was bought.