DataBank DFW9 – Red Oak
Batchler Rd & Stainback Rd, Red Oak, TX, 75154, US
Colocation space
200,000
sq ft
Power capacity
60 MW
DFW9 at 3080 Batchler Road was the first of the Red Oak buildings to come online and sets the pattern for the campus: 200,000 square feet of IT space against 60 megawatts of critical load, cooled N+1, supporting 45 kW per cabinet on air and over 100 kW with direct liquid cooling. Sixty megawatts in one building is more critical load than most operators run in an entire metro. A tenant sizing an AI training cluster here is choosing between whole halls rather than cabinets, and the campus substation means the power is already contracted rather than queued behind a utility interconnection study — which in North Texas in 2026 is the constraint that actually decides project timelines.
Facility Specifications
Site information
- Colocation space
- 200,000 sq ft IT space
- Power capacity
- 60 MW critical IT load
- Power density
- 45 kW+ per cabinet air-cooled; 100 kW+ liquid-cooled
- Uptime SLA
- 100% uptime SLA
Power & cooling
- Redundancy
- N+1 power design; fed from the 400 MW campus substation
- Cooling
- N+1 cooling design with direct liquid cooling to the cabinet
Compliance
ISO/IEC 27001
SOC 1
SOC 2
PCI DSS
HIPAA
Platforms & amenities
- Platforms & services
- Hall-scale colocation for AI training and HPC; DataBank Cloud and DataBank Metal in-metro; compliance enablement for FedRAMP, FISMA, StateRAMP and ITAR workloads
- Amenities
- First building delivered on the Red Oak campus; 100% renewable energy; 120/208V and 240/415V AC distribution; 7x24x365 operations and remote hands; smart hands by request
Colocation Packages
| Package | Size | Power | Bandwidth | Price (USD/mo) | Term | Setup | Quote |
|---|---|---|---|---|---|---|---|
| 42U Private Cabinet — 5 kW (208V A+B Redundant) | 42U — Private | 5 kW · 208V A+B | Request |
Request a Quote
Quote request for: DataBank DFW9 – Red Oak view facility
Selected package:
42U Private Cabinet — 5 kW (208V A+B Redundant)
change
- Size42U — Private
- Power5 kW
- Power Type208V A+B
Map
Frequently asked questions
Where is DataBank DFW9 – Red Oak located?
DataBank DFW9 – Red Oak is a colocation data center located at Batchler Rd & Stainback Rd, Red Oak, TX, US.
How much space and power does DataBank DFW9 – Red Oak offer?
DataBank DFW9 – Red Oak offers 200,000 sq ft IT space with 60 MW critical IT load of power.
What compliance certifications does DataBank DFW9 – Red Oak support?
DataBank DFW9 – Red Oak supports ISO/IEC 27001, SOC 1, SOC 2, PCI DSS, HIPAA.
How do I get a quote for colocation at DataBank DFW9 – Red Oak?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.