DataBank Red Oak Campus
Batchler Rd & Stainback Rd, Red Oak, TX, 75154, US
Colocation space
200,000
sq ft
Power capacity
400 MW
The Red Oak campus is the largest single site in this directory: 292 acres in Ellis County, twenty-one miles south of Dallas, master-planned for eight two-storey data centers of 200,000 square feet each. Phase one is four buildings behind a 400 MW substation that can deliver up to 300 MW of critical IT power, rising to 480 MW across all eight at full build. Each building supports 45 kW per cabinet on air and more than 100 kW liquid-cooled, which is the specification that decides whether a site can take GPU training racks at all. Red Oak has become a distinct North Texas submarket for exactly this reason, drawing the cloud and technology providers that follow contracted power.
Facility Specifications
Site information
- Colocation space
- 8 buildings at 200,000 sq ft each on 292 acres (4 in phase 1)
- Power capacity
- 400 MW substation; up to 300 MW critical IT in phase 1, 480 MW at full build
- Power density
- 45 kW+ per cabinet air-cooled; 100 kW+ liquid-cooled
- Uptime SLA
- 100% uptime SLA
Power & cooling
- Redundancy
- N+1 power design; dedicated 400 MW on-site substation
- Cooling
- N+1 cooling design with direct liquid cooling to the cabinet
Compliance
ISO/IEC 27001
SOC 1
SOC 2
PCI DSS
HIPAA
Platforms & amenities
- Platforms & services
- Hall-scale and build-to-suit colocation for AI and HPC deployments; DataBank Cloud and DataBank Metal in-metro; compliance enablement for FedRAMP, FISMA, StateRAMP and ITAR workloads
- Amenities
- Largest campus in this directory at 292 acres; 100% renewable energy; 120/208V and 240/415V AC distribution; 7x24x365 operations and remote hands; smart hands by request
Colocation Packages
| Package | Size | Power | Bandwidth | Price (USD/mo) | Term | Setup | Quote |
|---|---|---|---|---|---|---|---|
| 42U Private Cabinet — 5 kW (208V A+B Redundant) | 42U — Private | 5 kW · 208V A+B | Request |
Request a Quote
Quote request for: DataBank Red Oak Campus view facility
Location
Frequently asked questions
Where is DataBank Red Oak Campus located?
DataBank Red Oak Campus is a colocation data center located at Batchler Rd & Stainback Rd, Red Oak, TX, US.
How much space and power does DataBank Red Oak Campus offer?
DataBank Red Oak Campus offers 8 buildings at 200,000 sq ft each on 292 acres (4 in phase 1) with 400 MW substation; up to 300 MW critical IT in phase 1, 480 MW at full build of power.
What compliance certifications does DataBank Red Oak Campus support?
DataBank Red Oak Campus supports ISO/IEC 27001, SOC 1, SOC 2, PCI DSS, HIPAA.
How do I get a quote for colocation at DataBank Red Oak Campus?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.