DATAGROUP Datacenter
Simi Brodskykh St, 31/33, Kyiv, 03057, UA
Datagroup opened a new Kyiv data centre in the third quarter of 2024, and the specification reads as a wartime document. The hall draws a pair of 1 MW supplies, each taken from a different DTEK substation; four AKSA generators of 368 kVA run N+1 with at least 72 hours of fuel autonomy; and the machine hall is a semi-basement room under as much as a metre of reinforced concrete. That hall runs to about 300 m2 and takes more than 100 telecom cabinets. Schneider Electric Galaxy VL and Eltec Flatpack2 UPS plant sits in N+1, and two separate fibre entries reach the building, one of them carrying a guest optical splice so a customer can bring its own ISP. Thirteen networks and the DTEL-IX exchange are carried at Datagroup's Kyiv interconnection address on vulytsia Simyi Brodskykh, and the operator sells direct optical links to UA-IX, GIGANET, G-50 and I-IX. The TIER III and TIA-942 language it uses describes the design standard, not an award.
Facility Specifications
Site information
- Colocation space
- About 300 m2 machine hall, 100+ telecom cabinets
- Power capacity
- 2 x 1 MW independent utility feeds from separate DTEK substations
Power & cooling
- Redundancy
- N+1 UPS (Schneider Galaxy VL, Eltec Flatpack2); 4 x 368 kVA generators N+1, 72 h autonomy
Network ecosystem — 13 carriers on-net
Notable: Cloudflare (AS13335)