Dugny Digital Hub (PAR15)

Avenue de la 2e Division Blindée, Dugny, 93440, FR

Get a quote

Metro: Paris, FR Country: France Region: Europe

Colocation space
700,000
sq ft
Power capacity
176 MW

PAR15 is the first of three buildings on Digital Realty's Dugny campus, north-east of Paris on a former French Air Force site that had stood unused since 2011. It has been under construction since 2025, with first delivery expected in 2027. The campus as a whole is planned for more than 65,000 sq m of IT space and 176 MW of IT capacity across three buildings and thirty server rooms, fed by two dedicated 225 kV connections running roughly 28 kilometres underground from Plessis-Gassot and Villiers-le-Bel. Cooling uses air-cooled chillers and dry-coolers drawing on outside air. Recovered heat is contracted into the Coriance district heating network. This is the largest development Digital Realty has under way in France, and none of it is operational yet.

Facility Specifications

Site information

Colocation space
More than 65,000 sq m (over 700,000 sq ft) of IT space planned across the three-building campus
Power capacity
176 MW of IT capacity planned across the three-building campus

Power & cooling

Cooling
Air-cooled chillers and dry-coolers using outside air

Platforms & amenities

Amenities
Former French Air Force site, unused since 2011; 10,525 sq m of rooftop solar across the campus; recovered heat contracted into the Coriance district heating network; backup generation running on HVO rather than conventional diesel

Request a Quote

Quote request for: Dugny Digital Hub (PAR15) view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

Where is Dugny Digital Hub (PAR15) located?
Dugny Digital Hub (PAR15) is a colocation data center located at Avenue de la 2e Division Blindée, Dugny, FR.
How much space and power does Dugny Digital Hub (PAR15) offer?
Dugny Digital Hub (PAR15) offers More than 65,000 sq m (over 700,000 sq ft) of IT space planned across the three-building campus with 176 MW of IT capacity planned across the three-building campus of power.
How do I get a quote for colocation at Dugny Digital Hub (PAR15)?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.