Iron Mountain Data Centers MIA-1
2925 NW 120th Terrace, Miami, FL, 33167, US
Colocation space
150,000
sq ft
Power capacity
16 MW
Iron Mountain MIA-1 at 2925 NW 120th Terrace is a 150,000 sq ft AI-ready data center under construction in Central Northwest Miami, with completion expected in 2026. The purpose-built Tier III facility is designed for 16 MW of customer IT load on 26 MVA of redundant operational power, Category 5 hurricane-rated construction, and high-density GPU-ready configurations. Positioned as a gateway to Latin America and the Caribbean, it offers connectivity toward the NAP of the Americas and access to the region's dense submarine cable ecosystem.
Facility Specifications
Site information
- Colocation space
- 150,000 sq ft AI-ready facility (3.4-acre site)
- Power capacity
- 16 MW customer IT load; 26 MVA total redundant operational power; 100% renewable-matched
- Power density
- High-density, GPU-ready configurations
- Year built
- 2026 (completion expected)
Power & cooling
- Redundancy
- Purpose-built Tier III; diverse utility feeds; Category 5 hurricane-rated construction
Compliance
HIPAA
FISMA High
PCI-DSS
ISO 27001
SOC 2 Type II
SOC 3
BREEAM (targeted)
Platforms & amenities
- Platforms & services
- Colocation; interconnection; AI/GPU-ready deployments
- Amenities
- 24/7/365 on-site monitoring & security; conference rooms & offices; loading dock; Smart Hands
Colocation Packages
| Package | Size | Power | Bandwidth | Price (USD/mo) | Term | Setup | Quote |
|---|---|---|---|---|---|---|---|
| 42U Private Cabinet — 5 kW (208V A+B Redundant) | 42U — Private | 5 kW · 208V A+B | Request |
Request a Quote
Quote request for: Iron Mountain Data Centers MIA-1 view facility
Selected package:
42U Private Cabinet — 5 kW (208V A+B Redundant)
change
- Size42U — Private
- Power5 kW
- Power Type208V A+B
Map
Frequently asked questions
Where is Iron Mountain Data Centers MIA-1 located?
Iron Mountain Data Centers MIA-1 is a colocation data center located at 2925 NW 120th Terrace, Miami, FL, US.
How much space and power does Iron Mountain Data Centers MIA-1 offer?
Iron Mountain Data Centers MIA-1 offers 150,000 sq ft AI-ready facility (3.4-acre site) with 16 MW customer IT load; 26 MVA total redundant operational power; 100% renewable-matched of power.
What compliance certifications does Iron Mountain Data Centers MIA-1 support?
Iron Mountain Data Centers MIA-1 supports HIPAA, FISMA High, PCI-DSS, ISO 27001, SOC 2 Type II, SOC 3, BREEAM (targeted).
How do I get a quote for colocation at Iron Mountain Data Centers MIA-1?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.