Lunavi Cheyenne

340 Progress Circle, Cheyenne, WY, 82007, US

Get a quote

Metro: Cheyenne, WY, US Country: United States Region: North America

Carriers on-net
4
Power capacity
5 MW

Lunavi's Cheyenne data center at 340 Progress Circle, 90 miles north of Denver, was built by Green House Data from a groundbreaking on August 27, 2013, planned at 35,000 sq ft with its first phase finished by early 2014; a December 2018 third phase added two floors and 7,500 sq ft of white space, and the building now stands at 42,000 sq ft and 5 MW, owned by 1547 CSR and leased to Lunavi. The plant delivers 4 MW of critical IT load, expandable to 8 MW, through N+1 generators and UPS and N+2 cooling, with Vertiv indirect evaporative units holding an average PUE of 1.17. Cabinets run to 10 kW on A/B feeds, with 800 cabinets available and suites of 7,500 or 3,750 sq ft. Charter, Lumen, Viaerofiber and Zayo enter on two points of entry, and SOC 1 Type II and SOC 2 Type II audits cover the building. Buyers take cabinets or a 200- or 400-cabinet suite.

Facility Specifications

Site information

Power capacity
5 MW, expandable to 8 MW, 4 MW critical IT load
Power density
Up to 10 kW per cabinet
Uptime SLA
Concurrently maintainable design

Power & cooling

Redundancy
N+1 generators 6 MW with 24 h fuel, N+1 UPS 5 MW, N+2 cooling, A/B feeds, concurrently maintainable
Cooling
Vertiv indirect evaporative, hot-aisle containment, average PUE 1.17

Compliance

SOC 1 Type II SOC 2 Type II

Platforms & amenities

Amenities
Private suites 7,500 or 3,750 sq ft, 800 available cabinets

Network ecosystem — 4 carriers on-net


Request a Quote

Quote request for: Lunavi Cheyenne view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map