Monarch Data Center Campus

150-155 Penrose Ln, Yerington, NV, 89447, US

Get a quote

Metro: Fallon, NV, US Country: United States Region: North America

Power capacity
1,000 MW

Monarch is a Copia Power master plan on more than 500 acres off Penrose Lane outside Yerington, in Lyon County, Nevada, drawn as a north and a south campus totalling 4.6 million sq ft and 1,000 MW at full build. The Lyon County Board of County Commissioners moved the ground from agricultural to Specific Plan land use on 4 December 2025, then approved the rezoning on 6 August 2026 by three votes to one, with residents objecting at the hearing. That approval starts a twelve-month clock on the conditions attached to it, and final designs still need sign-off before ground is broken; none has been. Grid supply is the constraint: NV Energy has earmarked 2,550 MW for data centres in its resource plan, and until that capacity arrives Copia intends to run the site off its own gas generation and battery storage. Copia is a Carlyle-backed renewables developer rather than an established data centre operator.

Facility Specifications

Site information

Colocation space
4.6 million sq ft at full master-plan build-out
Power capacity
1,000 MW planned at full build-out

Request a Quote

Quote request for: Monarch Data Center Campus view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

What did Lyon County approve on 6 August 2026?
A zoning change for the Monarch site, carried three votes to one. It does not authorise construction: final designs still need approval, and the conditions attached run for a year.
How big is the Monarch master plan?
4.6 million sq ft and 1,000 MW at full build-out, across more than 500 acres on Penrose Lane.
How would Monarch be powered?
NV Energy in the long run - its resource plan sets aside 2,550 MW for data centres - with Copia self-supplying from its own gas plant and battery storage until that capacity is available.
Which company is developing Monarch?
Copia Power, a Carlyle-backed renewables developer. It is the applicant of record rather than an established data centre operator.
How can ColoMap help with a northern Nevada requirement?
Send an inquiry. The Yerington ground is unbuilt and years from capacity, and we can map the Nevada facilities taking deployments today.