Simpsonville Enterprise Data Center

70 Kingbrook Pkwy, Simpsonville, KY, 40067, US

Get a quote

Metro: Louisville, KY, US Country: United States Region: North America

Colocation space
102,500
sq ft
Power capacity
1,000 kW

Eaton built this as Project Bluegrass, announced in 2008 against a $160 million Shelby County industrial revenue bond and commissioned in 2011 to replace ageing data centres near the company's Cleveland headquarters. Of 102,500 sq ft on 21 acres in Kingbrook Commerce Park, 10,000 sq ft is live raised floor and a further 10,000 is held as shell, and the plant was sized for 1 MW of critical load rather than for density: a water-side economiser delivers free cooling for roughly seventy per cent of the Kentucky year against a design PUE of 1.7, with data halls held at 74°F and 47 per cent relative humidity. Kentucky Utilities feeds the building on two separate services behind an N+1 uninterruptible supply and two 2 MW generators. Aphorio Carter bought it in February 2025 alongside an identical twin at 12901 Plantside Drive in Louisville for about $35 million. In May 2026 the owner named the Kentucky building a letter-of-intent priority in a roughly 200 MW pipeline, with 365 Data Centers lined up as long-term operator.

Facility Specifications

Site information

Colocation space
102,500 sq ft; 10,000 sq ft raised floor
Power capacity
1,000 kW critical

Power & cooling

Redundancy
N+1 UPS; two 2 MW generators; two separate utility services; designed to Tier III standards
Cooling
Water-side economiser, free cooling ~70% of the year; design PUE 1.7

Request a Quote

Quote request for: Simpsonville Enterprise Data Center view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

Who built the facility and why?
Eaton Corporation, under a programme it called Project Bluegrass announced in 2008 and commissioned in 2011, to replace ageing data centres near its Cleveland headquarters. Shelby County backed it with a $160 million industrial revenue bond.
Which certifications are attested for the Simpsonville building?
None. The Tier III reference is the seller's design claim, Uptime Institute's award register carries neither Eaton nor Aphorio Carter, and the LEED Gold quoted in the sale material is the developer's own claim.
How much of the building is live?
10,000 sq ft of raised floor within 102,500 sq ft, with a further 10,000 sq ft of shell held for expansion on a 21-acre site.
What is changing at the site?
In May 2026 the owner and 365 Data Centers named Simpsonville a letter-of-intent priority in a roughly 200 MW pipeline, with 365 as the eventual operator on a nine-to-twenty-four-month timeline.