STACK Infrastructure NVA02B
9720 Hornbaker Rd, Bristow, VA, 20109, US
Power capacity
420 MW
Two on-site substations of 300 MW each carry this campus, which STACK publishes as 420 MW of critical capacity across ten buildings on 200 acres of Prince William County, addressed to Manassas by the operator and sitting in the Bristow ZIP off Linton Hall Road. Northern Virginia Electric Cooperative is the supplier. STACK bought adjoining land in 2023 to extend the site and asked the county to rezone it; supervisors refused, four votes to two, on 9 September 2025, so the published build-out is the campus as it stands. Capacity, building count and acreage are reported for the whole campus, without per-building figures.
Facility Specifications
Site information
- Power capacity
- 420 MW critical capacity, campus-wide
Request a Quote
Quote request for: STACK Infrastructure NVA02B view facility
Location
Frequently asked questions
What does STACK publish for the NVA02 campus?
420 MW of critical capacity across ten buildings on 200 acres in Prince William County, Virginia.
How is the campus powered?
By Northern Virginia Electric Cooperative, through two dedicated on-site substations of 300 MW each.
What happened to the expansion plan?
Prince William County supervisors voted four to two against rezoning the adjoining land on 9 September 2025. STACK had acquired that land in 2023.
Which figures does STACK give per building?
The location page reports capacity, building count and acreage for the campus as a whole, without breaking any of them down by structure.