STACK Infrastructure NVA02B

9720 Hornbaker Rd, Bristow, VA, 20109, US

Get a quote

Metro: Washington, DC, US Country: United States Region: North America

Power capacity
420 MW

Two on-site substations of 300 MW each carry this campus, which STACK publishes as 420 MW of critical capacity across ten buildings on 200 acres of Prince William County, addressed to Manassas by the operator and sitting in the Bristow ZIP off Linton Hall Road. Northern Virginia Electric Cooperative is the supplier. STACK bought adjoining land in 2023 to extend the site and asked the county to rezone it; supervisors refused, four votes to two, on 9 September 2025, so the published build-out is the campus as it stands. Capacity, building count and acreage are reported for the whole campus, without per-building figures.

Facility Specifications

Site information

Power capacity
420 MW critical capacity, campus-wide

Request a Quote

Quote request for: STACK Infrastructure NVA02B view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

What does STACK publish for the NVA02 campus?
420 MW of critical capacity across ten buildings on 200 acres in Prince William County, Virginia.
How is the campus powered?
By Northern Virginia Electric Cooperative, through two dedicated on-site substations of 300 MW each.
What happened to the expansion plan?
Prince William County supervisors voted four to two against rezoning the adjoining land on 9 September 2025. STACK had acquired that land in 2023.
Which figures does STACK give per building?
The location page reports capacity, building count and acreage for the campus as a whole, without breaking any of them down by structure.