Aligned IAD-04

5601 Manor Woods Rd, Frederick, MD, 21703, US

Get a quote

Metro: Washington, DC, US Country: United States Region: North America

Colocation space
450,000
sq ft
Power capacity
72 MW

Aligned IAD-04 is the first of four buildings on the 75-acre Maryland campus at 5601 Manor Woods Road in Frederick, a 72 MW, 450,000 sq ft data center on the former Alcoa Eastalco smelter land of the 2,100-acre Quantum Frederick park. The Frederick County Planning Commission approved its site plan 4-3 with conditions in May 2023, with 42 generators drawn, and Maryland's provisional exemption covers up to 70 MW of diesel generation. Aligned paused the project in mid-2023 over that generator ruling and broke ground in February 2025. The campus is master-planned for 264 MW across four multi-story buildings, with QLoop fiber linking Frederick to Ashburn at sub-millisecond latency. The design carries 3 MW generators and 2 MW UPS line-ups in N+1 block-redundant topology, 415 V A and B rack feeds, Delta³ air cooling in mechanical galleries and DeltaFlow liquid loops for GPU racks. Buyers can reserve a hall or a phase of the 72 MW.

Facility Specifications

Site information

Colocation space
450,000 sq ft (41,805 m²) building
Power capacity
72 MW

Power & cooling

Redundancy
N+1 block redundant, 3 MW generators, 2 MW UPS line-ups, 500 kVA PDUs, 415V A+B rack distribution
Cooling
Delta³ air cooling arrays in mechanical galleries, DeltaFlow liquid cooling secondary loops, closed-loop chilled water, minimum N+1

Platforms & amenities

Amenities
24x7x365 onsite security, 5-layer security, fixed and PTZ cameras, VESDA, dual-interlock pre-action fire suppression, 24x7x365 access

Request a Quote

Quote request for: Aligned IAD-04 view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map