EdgeCore Culpeper CP01
within Culpeper Technology Zone (CTZ), Culpeper, VA, 22701, US
Colocation space
920,000
sq ft
Power capacity
196 MW
EdgeCore's Culpeper campus takes 93 acres inside the Culpeper Technology Zone, 30 of them held as conservation area, and is planned as two buildings totalling 920,000 sq ft. The disclosed capacity is 196 MW of critical IT load for the initial phase. Cooling is closed-loop chilled water with a stated water-use effectiveness below 0.01 L/kWh. EdgeCore gives availability as mid-2029, and nothing has been built. Culpeper's operating interconnection today is Equinix's CU1 to CU4 at 18155 Technology Drive, carrying ten networks.
Facility Specifications
Site information
- Colocation space
- 920,000 sq ft across two buildings
- Power capacity
- 196 MW critical IT load, initial phase
Power & cooling
- Cooling
- Closed-loop chilled water; WUE below 0.01 L/kWh
Request a Quote
Quote request for: EdgeCore Culpeper CP01 view facility
Location
Frequently asked questions
When will EdgeCore's Culpeper campus be available?
EdgeCore states mid-2029. The site is unbuilt; the 93-acre campus sits in the Culpeper Technology Zone with 30 acres held as conservation area.
How big is the Culpeper scheme as planned?
Two buildings totalling 920,000 sq ft, with 196 MW of critical IT load disclosed for the initial phase.
How will the Culpeper buildings be cooled?
Closed-loop chilled water, with a stated water-use effectiveness below 0.01 L/kWh.
What interconnection already exists in Culpeper?
Equinix's CU1 to CU4 at 18155 Technology Drive, with ten networks on-net. EdgeCore's campus is a separate site and carries no network presence yet.