Digital Dulles Campus

Old Ox Road / Efficiency Dr, Dulles, VA, 20166, US

Get a quote

Metro: Washington, DC, US Country: United States Region: North America

The Digital Dulles campus is a 433-acre site off Old Ox Road in Sterling, acquired by Digital Realty from the Metropolitan Washington Airports Authority and master-planned for fourteen buildings totalling 11.7 million sq ft, with as much as a gigawatt of capacity delivered through six on-site substations. The first building, IAD44, came into service in 2023 at 648,500 sq ft, and a January 2026 application adds two further buildings and expands two of the substations. A buyer with a multi-year growth path can contract phased capacity here at hyperscale under one operator, one campus fibre plant and one power programme.

Facility Specifications

Site information

Colocation space
433 acres master-planned for fourteen buildings and 11.7 million sq ft
Power capacity
Up to 1 GW planned across six substations

Platforms & amenities

Platforms & services
Multi-building development campus; hyperscale and wholesale capacity delivered in phases
Amenities
First building delivered 2023; a January 2026 application adds two further buildings and two substation expansions

Colocation Packages

Package Size Power Bandwidth Price (USD/mo) Term Setup Quote
42U Private Cabinet — 5 kW (208V A+B Redundant) 42U — Private 5 kW · 208V A+B Request

Request a Quote

Quote request for: Digital Dulles Campus view facility
Selected package: 42U Private Cabinet — 5 kW (208V A+B Redundant) change
We'll route your request to the facility and email you a copy.

Map

Interactive map

Frequently asked questions

Where is Digital Dulles Campus located?
Digital Dulles Campus is a colocation data center located at Old Ox Road / Efficiency Dr, Dulles, VA, US.
How much space and power does Digital Dulles Campus offer?
Digital Dulles Campus offers 433 acres master-planned for fourteen buildings and 11.7 million sq ft with Up to 1 GW planned across six substations of power.
How do I get a quote for colocation at Digital Dulles Campus?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.