Old Ox Road

Old Ox Road, Dulles, VA, 20166, US

Get a quote

Metro: Washington, DC, US Country: United States Region: North America

Power capacity
96 MW

Digital Realty's Old Ox Road frontage sits within Digital Dulles, the 425-acre campus the operator describes as the largest multi-tenant data centre campus in the world. The land came from the Metropolitan Washington Airports Authority in 2018 for $236.5 million; the programme has since grown from 7.5 million to 11.7 million sq ft across fourteen buildings, with full build-out planned at up to a gigawatt supported by six substations. The first building was delivered in 2023, and two further buildings plus the relocation and expansion of two substations were filed with the Army Corps of Engineers in January 2026. What sits here is hyperscale capacity, part operating and part under construction, rather than a single colocation hall.

Facility Specifications

Site information

Power capacity
One asset on this campus is disclosed at 96 MW of IT capacity, fully leased; the campus as a whole is planned at up to 1 GW across fourteen buildings and six substations

Platforms & amenities

Amenities
425-acre campus off Old Ox Road acquired from the Metropolitan Washington Airports Authority in 2018; first building delivered 2023; further buildings and substation works filed January 2026; Digital Realty took a 50 per cent interest in the leased asset here from Blackstone in June 2026

Colocation Packages

Package Size Power Bandwidth Price (USD/mo) Term Setup Quote
42U Private Cabinet — 5 kW (208V A+B Redundant) 42U — Private 5 kW · 208V A+B Request

Request a Quote

Quote request for: Old Ox Road view facility
Selected package: 42U Private Cabinet — 5 kW (208V A+B Redundant) change
We'll route your request to the facility and email you a copy.

Map

Interactive map

Frequently asked questions

Where is Old Ox Road located?
Old Ox Road is a colocation data center located at Old Ox Road, Dulles, VA, US.
How much space and power does Old Ox Road offer?
Old Ox Road offers One asset on this campus is disclosed at 96 MW of IT capacity, fully leased; the campus as a whole is planned at up to 1 GW across fourteen buildings and six substations of power.
How do I get a quote for colocation at Old Ox Road?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.