Prime Phoenix PHX01-03
3708 S Avondale Blvd, Avondale, AZ, 85323, US
Colocation space
267,000
sq ft
Power capacity
48 MW
PHX01-03 is the third of five buildings on Prime Data Centers' Avondale campus and the last of the three that broke ground on 21 May 2026. Its address is 3708 S. Avondale Blvd in Maricopa County, Arizona, and it carries 48 MW of critical IT load across the campus-standard 267,000 sq ft footprint. PHX01-04 and PHX01-05, at 3712 and 3716, have not started: Prime marks the fourth available and the fifth in development. Salt River Project serves the whole 66.5-acre site through a 250 MW on-site substation.
Facility Specifications
Site information
- Colocation space
- 267,000 sq ft
- Power capacity
- 48 MW critical IT load
Request a Quote
Quote request for: Prime Phoenix PHX01-03 view facility
Location
Frequently asked questions
Which buildings on the Avondale campus are under construction?
PHX01-01, PHX01-02 and PHX01-03, all started on 21 May 2026. PHX01-04 is marked available and PHX01-05 sits in development.
What are the addresses of the five campus buildings?
3700, 3704, 3708, 3712 and 3716 S. Avondale Blvd.
How much capacity will the campus hold?
240 MW across five buildings of 48 MW each, 1.3 million sq ft in total.